BOUFARIK POWER PLANT I

Teslim alma yeri Ankara, Turkey Teslim yeri Mostaganem, Algeria
Rota
Ankara, Turkey - Mostaganem, Algeria
Müşteri
GAMA POWER
Yük
Steel Structures
Ülke
ALGERIA
Sevkiyat tarihi
OCTOBER 2014
Hacim
153 Pckgs // 450Mts // 1200 Cbm

Proje fotoğrafları

BOUFARIK POWER PLANT I

Proje kapsamı

  • Pre Carriage from Factory to Port.
  • Acceptance of the Cargo at Derince Port.
  • Unloading of Cargo from Lowbed into Store Area.
  • Loading of Cargo to Chartered Vessel.
  • Arranging all Lashing /Dunnage /Securing of Cargo on Board.
  • Sea Transportation ex Derince Port to Mostaganem Port by Vessel.
  • Discharging of Cargo at Mostaganem.
  • Delivery of Cargo at Job Site.
ÖnizlemeBATI Innovative LogisticsBATI Logistics GmbHBATI Logistics S.r.l.BATI Logistics Inc.BATI Yacht LogisticsBATI Yacht TransportScanwell Logistics TürkiyeBATI Innovative Logistics (yerel)