DONGHAI // VIETNAM

Teslim alma yeri Ankara, Turkey Teslim yeri Ho Chi Minh, Vietnam
Rota
Ankara, Turkey - Ho Chi Minh, Vietnam
Müşteri
DONGHAI
Yük
Mobile Power Station
Ülke
VIETNAM
Sevkiyat tarihi
MARCH 2014
Hacim
2 pcs // 37 Mts // 365 CbmLxWxH 10500 x 4200 x 4680 mm // 18800 KGsLxWxH 10500 x 3500 x 4300mm // 18200 KGs

Proje fotoğrafları

DONGHAI // VIETNAM

Proje kapsamı

  • Arranging Temporary Plated Truck to Pull the Trailers ex Factory Ankara.
  • Transportation from Ankara to Ambarli Port.
  • Arranging Ramp to Load to Flat Rack.
  • Arranging Stowage ,Dunage and Lashing.
  • Sea Transportation ex Ambarlı Port to Ho Chi Minh.
ÖnizlemeBATI Innovative LogisticsBATI Logistics GmbHBATI Logistics S.r.l.BATI Logistics Inc.BATI Yacht LogisticsBATI Yacht TransportScanwell Logistics TürkiyeBATI Innovative Logistics (yerel)